top of page

Cheltenham Shopping
Centre: Commercial Solar & Battery Storage

Cheltenham

ABOUT THE PROJECT

Powering Gloucester’s Business Future: 216kW Solar & 202kWh Battery Storage System, Delivered by Your Eco

Your Eco delivered a 216kW commercial solar PV system with 202kWh of Tesla Powerwall battery storage for a leading Gloucester business. The project features 509 Q CELLS 425W Q Iron modules and 256 SolarEdge optimisers, enabling 197,390 kWh of annual solar generation. This system offsets 38,170 kg of CO₂ per year—equivalent to planting 43,825 trees—while providing robust energy security and grid independence.

Project Highlights

Project Overview


System Size: 216kW solar PV, 202kWh battery storage

Technology:

  • 509 Q CELLS 425W Q Iron solar PV modules

  • 256 SolarEdge optimisers (module-level monitoring)

  • 15 Tesla Powerwalls across 5 connection points

Battery configuration:

  • 2 × 46.2kW + 40.5kWh Tesla Powerwall systems

  • 2 × 34kW + 40.5kWh Tesla Powerwall systems

  • 1 × 43kW + 40.5kWh Tesla Powerwall system

Annual Solar Production: 197,390 kWh

Carbon Offset: 38,170 kg CO₂/year (43,825 trees planted equivalent)

  • Key Outcomes:

    • Significant carbon reduction

    • Resilient, audit-ready energy infrastructure

    • Enhanced energy independence and operational savings

15575.jpg

Watch Our Projects in Action

Discover more of our work on Our YouTube Channel.

Installing Solar Panels

Take the First Step

Whether you're a multinational organisation seeking to reduce carbon emissions across your estate, a construction firm integrating renewable energy into development projects, or a private estate moving toward energy independence, Your Eco delivers renewable solutions engineered for excellence.

bottom of page